Trade-specific RAMS

Glazier RAMS Template

This comprehensive Glazier RAMS (Risk Assessment & Method Statement) template is specifically designed for UK glazing contractors and fit out specialists. It provides a robust framework to ensure compliance with the latest UK health and safety legislation, including CDM 2015, th…

  • Risk Assessment table with likelihood × severity scoring
  • Method statement — step-by-step safe procedure
  • PPE requirements with BS EN standards
  • Emergency procedures + sign-off section
  • Add your company name + site detail in seconds

Sample preview

First sections of the document. Buy to download the full version as a branded PDF.

Glazier RAMS Template

Document Control

Document ReferenceRevisionDate IssuedPrepared ByApproved By
GLAZ-RAMS-0011.02024-07-30[Your Company Name][Approved By Name/Role]

Project Information

Project Name[Insert Project Name]
Project Address[Insert Project Address]
Client[Insert Client Name]
Principal Contractor[Insert Principal Contractor Name] (as per CDM 2015)
Site Contact[Insert Site Contact Name & Number]
Work Dates[Insert Start Date] to [Insert End Date]
Scope of Work[Briefly describe specific glazing tasks for this project, e.g., "Installation of double-glazed units into aluminium frames on levels 1-3," or "Removal and replacement of shopfront glazing."]

Scope of Work

This RAMS covers the safe execution of glazing activities, including but not limited to:

  • Site survey and preparation for glazing works.
  • Safe receipt, storage, and handling of glass units, frames, and associated materials.
  • Preparation of openings, including cleaning and inspection.
  • Installation, removal, or replacement of various types of glass units (e.g., single pane, double-glazed, laminated, toughened) and associated framing systems.
  • Application of sealants, gaskets, and beads.
  • Use of hand tools, power tools, and specialist glazing equipment.
  • Working at height using appropriate access equipment.
  • Waste management and site clean-up upon completion.

All work will be carried out in accordance with the Health and Safety at Work Act 1974, the Management of Health and Safety at Work Regulations 1999, the Construction (Design and Management) Regulations 2015 (CDM 2015), the Work at Height Regulations 2005, the Control of Substances Hazardous to Health Regulations 2002 (COSHH 2002), and the Provision and Use of Work Equipment Regulations 1998 (PUWER 1998).

Risk Assessment

| Hazard | Who at risk | Likelihood (1-5) | Severity (1-5) | Risk Score | Control Measures | Glaziers, Operatives, Site Personnel, Visitors, Pedestrians | 2 | 5 | 10 | Pre-Work Planning:

  • CDM 2015 Compliance: Ensure all works are properly planned, manage

Full document includes the complete risk assessment table, method statement, PPE list, emergency procedures and sign-off.

Need RAMS for a specific job, not just a trade?

Use the AI generator at ramsready.co.uk — describe your exact job in plain English and get a fully tailored RAMS in 2 minutes. £7.99/month, unlimited documents.

Try AI generator